CDG worked with Bundy-Finkel Architects to complete the demolition and renovation of office and lab space for an aircraft interior, seat and composite structure supplier, Encore Aerospace. The project included revisions of the size of the office, workroom and lab area was done in order to reduce it by 2,040 sqft. with the addition to the manufacturing area, creating a new break room. Outside the building, the parking lot was re-striped, curbs were replaced, and a sloped walkway at the existing entrance.

7,835

Square Feet

3

Months To Complete

1,044,391

Total Project Budget

1

Happy Customer

Behind The Scenes

Meet Scott.


"Construction of the elevator shafts involved strategic planning involving the location of temporary barricades and logistics planning of construction flow as the project was conducted in a fully occupied lab/science building."