Behind The Scenes

The Details.


This BSL-2 lab and professional office space build out for InvivoGen included the demolition of existing exterior glass block building walls and infrastructure upgrades to support HVAC systems designed to strictly comply with humidity, pressure, temperature, and ventilation and noise considerations. This included the installation and relocation of necessary controls, piping and duct work for which field conditions were confirmed and existing pipe sizes were checked to ensure flow rates were not adversely affected in the existing system.

9,400

Square Feet

7

Months To Complete

1,459,718

Total Project Budget

1

Happy Customer

CompanyInvivoGenLocationSan Diego, CASize9,400 sqftCost$1,459,718