The Details.


This BSL-2 lab and professional office space build out for InvivoGen included the demolition of existing exterior glass block building walls and infrastructure upgrades to support HVAC systems designed to strictly comply with humidity, pressure, temperature, and ventilation and noise considerations. This included the installation and relocation of necessary controls, piping and duct work for which field conditions were confirmed and existing pipe sizes were checked to ensure flow rates were not adversely affected in the existing system.

9,400

Square Feet

7

Months To Complete

1,459,718

Total Project Budget

1

Happy Customer

Behind The Scenes

Meet Jaymie.


"It was really interesting working on a building shaped like a triangle. We faced unexpected challenges because of its shape such as window system joints and flooring layout."

Do You Like What You See?

CompanyInvivoGenLocationSan Diego, CASize9,400 sqftCost$1,459,718