
This fast-paced project included floor leveling of floors up to 1 ¾” out of level. The high end finish required tight tolerances for the specialty office glazing systems. Intricate coordination effort to discover the existing Post Tensioned locations to work with the new cores, over 140 locations up to 8” in diameter.
20,000
14
$3,200,000
1
CompanyAir Treatment CorporationLocationBrea, CASize21,590 sqftCost$1,056,214